News

News

Accelerating News Issue 23 published

Latest issue of Accelerating news now available

News
Accelerators
15 December, 2017
Accelerators
News
15 December, 2017

LHC Report: An eventful and successful 2017

Now that the successful 2017 run has ended, let’s take a look back at a year full of events

News
Accelerators
12 December, 2017
Accelerators
News
12 December, 2017

Crab cavities: colliding protons head-on

The crab cavities, a new technology to brighten up the future, will play an important role in the High-Luminosity LHC

News
Accelerators
08 December, 2017
Accelerators
News
08 December, 2017

At the LHC, tomorrow is already here

Before the LHC was shut down for the winter, the operators tested techniques under development for its successor, the High-Luminosity LHC (HL-LHC)

News
Accelerators
05 December, 2017
Accelerators
News
05 December, 2017

New magnets to feed the Proton Synchrotron Booster

New septum magnets will send the beam to the four rings of the PS Booster after the Long Shutdown 2

News
Accelerators
21 November, 2017
Accelerators
News
21 November, 2017

LHC Report: record luminosity, well done LHC

The LHC’s 2017 proton run has ended with record luminosity. The special runs will now take place before the winter shutdown

News
Accelerators
20 November, 2017
Accelerators
News
20 November, 2017

Record luminosity: well done LHC

The LHC’s 2017 proton run has ended with record luminosity. The special runs will now take place before the winter shutdown.

News
Accelerators
13 November, 2017
Accelerators
News
13 November, 2017

LHC Report: LHC reaches 2017 targets

Not only has the LHC reached its 2017 production target ahead of schedule, it has also doubled its design luminosity

News
Accelerators
07 November, 2017
Accelerators
News
07 November, 2017

CLEAR prospects for accelerator research

A new user facility, the CERN Linear Electron Accelerator for Research (CLEAR), hosts accelerator research and development projects

News
Accelerators
01 November, 2017
Accelerators
News
01 November, 2017

LHC reaches 2017 targets ahead of schedule

With 19 days still to go, the LHC has reached its 2017 production target, delivering more than 45 inverse femtobarns to the experiments

News
Accelerators
30 October, 2017
Accelerators
News
30 October, 2017